COMPLETE AIRFRAME KIT... See Order Form 
All aluminum tubing to complete fuselage, wings, landing gear, cabines, lift struts, and formers. All aluminum sheet metal to construct gussets, cowling, & seat. All machined parts for control systems, lift struts, axles, and wings. All AN hardware to build aircraft, eye bolts, locknuts, thimbles, nico press swedges , aircraft cable (rudder cables, drag/anti/drag braces). Ball bearing rod ends for control system. Stainless steel pop rivets. Main wheels, tail wheel, spun aluminum nose bowl, plans and builders video. All covering supplies through silver. 
DELUXE AIRFRAME KIT... See Order Form 
Deluxe kit consists of complete airframe kit plus engine mount and fuel tank. Also available are spun aluminum wheel covers.  
NIEUPORT 17 BIPLANE 
SUB KITS 
Kit #1, rudder 
Includes materials to construct rudder spar, rudder bow, ribs, gussets, control horn, wooden dowel rods, hinges, rivets, AN hardware and plans. 
The rudder kit is introduces as the first assembly designed to introduce a new builder to the method of construction as well as familiarize him with the plans. Approximate construction time: 6 hours 
Cost... See Order Form 
Kit #2, Fuselage 
This kit consists of materials to construct fuselage ladder truss, gussets, inner sleeves, machine parts, rivets, AN hardware, hinges and plans. Fuselage just be constructed prior to proceeding with the other kits. Approximate construction time: 48 hours. 
Cost... See Order Form 
Kit #3, Horizontal Stabilizer and Elevator 
This kit consists of materials to construct spars, Elevator bow, horizontal frame, ribs, gussets, rivets, wooden dowel rods, hinges, inner sleeves, An hardware and plans. Approximate building time: 9 hours. 
Cost... See Order Form 
Kit #4, Landing Gear 
Consists of materials required to construct gear legs, gussets, axle, main wheels, bearings, machined parts, bracing cables, nico press swedges, tangs, An hardware, tail wheel, bungee cord, and plans. Approximate building time: 14 hours. 
Cost... See Order Form 
Kit #5, Wing 
Consists of materials to construct spars, compression struts, inner sleeves, machined parts, ribs, top bow, hinges, drag/anti-drag cables, nico press swedges, thimbles, tangs, gussets, rivets, An hardware, wooden dowel rods and plans. Approximate construction time: 80 hours. 
Cost... See Order Form 
Kit #6, Cabanes and lift struts 
Consists of materials to construct lift struts, Cabanes, all machined lift forks, ovalized tubing, gussets, An hardware, wooden dowel rods and plans. Approximate construction time: 80 hours. 
Cost... See Order Form 
Kit #7, Control Systems 
Consists of materials to construct torque tube assemble, elevator push/pull tube, rudder pedals, cables, nico press swedges, thimbles, tangs, machined parts, uniflex cables, An hardware, sheet metal, ball bearing rod ends, floor pans and plans. Approximate construction time: 18 hours 
Cost... See Order Form 
Kit #8, Firewall and formers 
Consists of materials to construct firewall, sheet metal for seat, tubing for formers, wooden dowel rods, rivets, front deck, instrument panel, turtle deck former. Approximate construction time: 16 hours. 
Cost... See Order Form 
Kit #9, covering supplies 
Consists of materials required to cover aircraft, ceconite poly tak, poly brush, poly spray, reinforcing tape, rivets, finishing tapes. Approximate building time: 100 hours. 
Cost... See Order Form 
Kit #10, Fuel Tank 
Fuel tank comes welded with supplies to install sight gauge. 
Cost... See Order Form 
Kit #11, Engine Mounts 
Engine mount comes welded and ready for installation. 
Cost... See Order Form 
Kit #12, Cowling 
Kit consists of spun aluminum nose bowl and sheet metal for wrap around. 
Cost... See Order Form 
The Airdrome Airplanes full scale NIEUPORT 17 can be constructed using normal hand tools consisting of hacksaw, hand drill, file, pop rivet gun, wrenches, and hand nico press tool. Area required for construction should be approximate the size of a single car garage.